TYT  >  AI - Page Sitemap  >  top quality scaffolding pipe series for building
top quality scaffolding pipe series for building

top quality scaffolding pipe series for building
  • top quality scaffolding pipe series for building
  • H7c2b1d693a074a9fbdc8bf3aa2cb052f4.jpg
  • 27674.jpg
  • MXsrrK1Rjy1zeq6xalFXaj.jpg_350x350.jpg
  • 15652282291383.jpg

top quality scaffolding pipe series for building

The product is safe in use. It will go in pause mode if there is any inconsistent operation, offering protection for operators. It is mainly used for the construction of greenhouses and highway columns and guardrails
Inquire Online
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • Our factory are recognized by nation,special materials can be customized,meet every country's standards requirement(ASTM,BS1387,JIS,ect)
  • Professional packing team, working with standardization,Process-oriented.Avoid packing damage to the pipe body.Delivery period is short,The fastest delivery time can be 5 days.
  • Our factory has its own "experimental testing center".Can meet all aspects of detection,to ensure product quality.Cintrol quality strictly.
  • The first pass is the quality inspection on the production line,The second pass is full inspection of the production quality .
  • Support third-party testing,as SGS, BV, ect.
scaffolding pipe description
The product is built to last for a long time. The mechanical structure is robust enough to withstand extreme working conditions, such as daily heavy use. It is easy to process and economical
top quality scaffolding pipe series for building-1
top quality scaffolding pipe series for building-2
scaffolding pipe SPECIFICATIONS
FOB PortTianjin
Terms of PaymentFOB,CNF,CIF,EXW
Thickness2.0~4.0mm
Standard size48mm / 60mm
Free sampleAvailable
MOQ5MT, shipment should be based on full container qty
Lead Time25~30days
Packing:Bundle,PVC Coating or as customer request.
Place of OriginChina (Mainland)
Supply Ability:40000 Metric Ton/Metric Tons per Month
Payment termsT/T,L/C
It can be processed by hot-dip galvanizing or electric galvanizing. Made by one of the Tianjin Science and Technology SMEs, its quality is guaranteed. Other metals such as manganese, titanium, and tungsten can be added into its materials for required strength and flexibility.
Suggested Videos
Advanced process equipment is used during the production of TYT scaffolding pipe, such as the newest CNC cutting, stamping, and welding machines. Water- soluble packaging bags can be also applied as a pesticide packaging that greatly reduces the incidence of pesticide poisoning
Each TYT scaffolding pipe is strictly manufactured. As soon as each department is finished with their assigned task, the shoe is passed on to the next manufacturing stage. Located in Nanhai High-tech Zone, our factory covers 3300 square meters with over 60 employees
TYT scaffolding pipe has been strictly tested. It has passed through the environmental testing for humidity, vibration, susceptibility, drop, bump and shock. Located in Nanhai High-tech Zone, our factory covers 3300 square meters with over 60 employees
TYT scaffolding pipe is innovatively developed by the R&D team. It is developed with a complete refrigeration system including the condenser, the compressor, the evaporator, and the expansion valve. The performance of our water-soluble PVA film for laundry detergent products has reached internationally advanced level
Much advanced quality inspection equipment is used in TYT scaffolding pipe production. It is finely handled by the coordinate measuring machine (CMM), caliper, microcaliper, gauge, and pass meter. Integrated continuously cutting design is very stable and effective
Internationally-certified quality: The product, tested by the authoritative third-party, has been approved to meet with the widely-recognized international quality standards. Our products range covers cold water soluble packaging PVA film series which include over 10 different types
Product Message
Contact